Ziitek
← دراسات الحالة
New Energy · EV Battery Pack Manufacturer

Battery Pack Gap Filling at Scale

Automated dispensing of thermal putty cut cycle time 35% with no pump-out failures.

التحدي

Module-to-pack tolerances up to 3 mm made pads uneconomical; manual assembly limited throughput.

الحل

Thermal putty dispensed robotically between cells and cold plate, replacing die-cut pads.

النتائج

  • ▸Cycle time −35%
  • ▸Zero pump-out after 10k vibration cycles
  • ▸Material cost −28%

Process guidelines and dispensing parameters documented for the customer's line.

Battery Pack Gap Filling at Scale | Ziitek